2.               ENVIRONMENTAL AUDIT

Implementation Status of Environmental Mitigation Measures

2.1               Site audit was carried out on a monthly basis to monitor environmental issues to ensure that all mitigation measures were implemented timely and properly.

2.2               Monthly site inspection was carried out on 14 August 2007. Environmental mitigation measures for water quality, waste management, landscape and visual, as recommended in the EIA report, Operational EM&A Plan and EP were properly implemented. There was no specific observation requiring following up action. In general, the condition of the WRC was satisfactory:

�          No floating refuse was observed.

�          No uncontrolled surface runoff into the lake was observed.

�          No algicide was applied to the WRC.

�          No discharge was made from the WRC into marine water.

�          No improper storage of oil/chemicals was observed.

�          Environmental Permit was kept in the site office and was available for inspection upon request.

2.3               A summary of the Environmental Mitigation Implementation Schedule (EMIS) is presented in Appendix B.

Status of Environmental Licensing and Permitting

2.4               All permits/licences/notifications obtained as of the reporting period are summarised in Table 2.1

 

Table 2.1��������� Summary of Environmental Notification, Licensing and Permit Status

 

Permit No.

Valid Period

Description

Status

From

To

Environmental Permit

EP-01/097/2001/C

19 Oct. 05

-

Operation of an approximately 32 ha water recreation centre with a 12 ha multi-function artificial lake, water-based and land-based recreational facilities and ancillary facilities

Valid

Chemical Waste Registration

9499-973-H3095-01

29 Jul. 05

-

Theme Park at Penny�s Bay

Valid

Waste Management

2.5               Waste management of WRC was implemented as stipulated in the Waste Management Plan.

2.6               As waste management of WRC was undertaken as part of the overall Theme Park Resort waste management scheme, records of waste handling and disposal would be reported in the Theme Park EM&A Report.

Implementation Status of Environmental Complaint Handling Procedures

2.7               Appendix C presents the environmental complaint flow diagram of the Project.

2.8               No complaint, summons or prosecution related to environmental issues was received or made against the Project in the reporting period.