2.1
Site audit was carried out on a
monthly basis to monitor environmental issues to ensure that all mitigation
measures were implemented timely and properly.
2.2
Monthly site inspection was carried
out on 14 August 2007. Environmental
mitigation measures for water quality, waste management, landscape and visual,
as recommended in the EIA report, Operational EM&A Plan and EP were properly implemented. There
was no specific observation requiring following up action. In general, the
condition of the WRC was satisfactory:
�
No floating
refuse was observed.
�
No uncontrolled surface runoff into the lake was
observed.
�
No algicide was applied to the WRC.
�
No discharge was made from the WRC
into marine water.
�
No improper storage of oil/chemicals
was observed.
�
Environmental
Permit was kept in the site office and was available for inspection upon
request.
2.3
A summary of
the Environmental Mitigation Implementation Schedule (EMIS) is presented in
Appendix B.
2.4
All
permits/licences/notifications obtained as of the reporting period are
summarised in Table 2.1
Table 2.1��������� Summary of Environmental
Notification, Licensing and Permit Status
|
Permit No. |
Valid Period |
Description |
Status |
|
|
From |
To |
|||
|
Environmental Permit |
||||
|
EP-01/097/2001/C |
19 Oct.
05 |
- |
Operation of an approximately |
Valid |
|
Chemical Waste Registration |
||||
|
9499-973-H3095-01 |
29 Jul.
05 |
- |
Theme Park at Penny�s Bay |
Valid |
2.5
Waste management of WRC was implemented as stipulated
in the Waste Management Plan.
2.6
As waste management of WRC was undertaken as part of
the overall Theme Park Resort waste management scheme, records of waste
handling and disposal would be reported in the Theme Park EM&A Report.
2.7
Appendix C presents the
environmental complaint flow diagram of the Project.
2.8
No complaint, summons or prosecution related to
environmental issues was received or made against the Project in the reporting
period.