1.1
ENSR
1.2
The WRC is a portion of the Contract for “Theme Park and Associated
Infrastructures at Penny’s Bay”, which encompasses an area of approximately
1.3
Following approval of the EIA, an Environmental Permit (EP) was issued
to the Civil Engineering Department (CED) (now Civil and Engineering
Development Department (CEDD) and the subsequent variation of the permit no.
EP-097/2001/B and EP-138/2002/C contain the requirements and obligations on the
Environmental Monitoring and Audit (EM&A) during the operation of the
WRC. Under the Contract for “Theme Park and Associated Infrastructures at
Penny’s Bay”, the WRC and ancillary facilities were designed and constructed
under the supervision of CEDD and the WRC would be turned over from CEDD to
1.4
This report presents the results of environmental audit works conducted
between 16 July and 15 August 2007.
1.5
The structure of the environmental management team is
shown in Figure 1.2. Contacts of key environmental staff of the Project are
shown in Appendix A.
1.6
The latest
EM&A programme requires environmental audit at the WRC. The purpose of the
audit was to ensure all environmental mitigation
measures, as recommended in the EIA
report, Operational EM&A Plan and EP-01/097/2001/C, were properly implemented.
1.7
Site audit and the status of environmental licensing
and permits are described in Section 2.
1.8
Summary of the advice on the implementation status of
environmental protection and pollution control/mitigation measures is
summarised in Section 2 of the Report.