3.1
Site audit was carried out on a
monthly basis to monitor environmental issues to ensure that all mitigation
measures were implemented timely and properly.
3.2
Monthly site inspection was
carried out on 28 March 2006. Environmental
mitigation measures for water quality, waste management, landscape
and visual, as recommended in the EIA report, Operational EM&A Plan and EP-01/097/2001/C
were properly implemented. The findings of the site audit include:
·
Water in the
lake appeared to be less clear than the previous few months. Sedimentation
tanks located upstream of the lake would be inspected in the next site
inspection.
·
No floating
refuse was observed.
·
Further Environmental
Permit was posted at vehicle site entrance.
3.3
A summary of
the Environmental Mitigation Implementation Schedule (EMIS) is presented in
Appendix G.
3.4
All
permits/licences/notifications obtained as of the reporting period are
summarised in Table 3.1
Table 3.1 Summary of Environmental
Notification, Licensing and Permit Status
|
Permit No. |
Valid Period |
Description |
Status |
|
|
From |
To |
|||
|
Environmental Permit |
||||
|
EP-01/097/2001/C |
19 Oct.
05 |
- |
Operation of an approximately 32
ha water recreation centre with a 12 ha multi-function artificial lake,
water-based and land-based recreational facilities and ancillary facilities. |
Valid |
|
Chemical Waste Registration |
||||
|
9499-973-H3095-01 |
29 Jul.
05 |
- |
Theme Park at Penny’s Bay |
Valid |
3.5
The Event and
Action Plans for water quality are presented in Appendix H.
3.6
No exceedance of AL Levels for water quality was recorded.
3.7
Waste management of WRC was implemented as stipulated
in the Waste Management Plan.
3.8
As Waste Management of WRC was undertaken as part of
the overall Theme Park Resort waste management scheme, records of waste
handling and disposal would be reported in the Theme Park EM&A report.
3.9
Appendix I presents
the environmental complaint flow diagram of the Project.
3.10
No complaint, summon or prosecution related to
environmental issues was received or made against the Project in the reporting
period.